Free 2026 calculator

Concrete Calculator

Use our free concrete calculator to find how much concrete you need in cubic yards, add a waste allowance and estimate material cost using a price per cubic yard.

Your project details

Change the assumptions below to match your project.

Planning estimate only. Actual contractor pricing varies with scope, access, code requirements, permits, labor availability, product brand, warranty and site conditions.

Start with geometry, then think about the pour

The calculator converts length × width × thickness into cubic feet, divides by 27 to get cubic yards, then applies the allowance you select. That gives a quantity target. It does not yet tell you the final delivered order or installed project cost.

Worked example: 20 × 12 ft slab at 4 inches

Four inches is 0.333 ft. The theoretical volume is 20 × 12 × 0.333 = about 79.9 cubic feet. Divide by 27 and the slab is about 2.96 yd³ before an allowance. With 5% extra, the planning quantity is about 3.11 yd³.

Do not use “waste” to hide missing geometry

If the slab has a thickened edge, footing, step or deeper section, calculate that volume separately and add it. A percentage allowance is for uncertainty and handling loss, not for parts of the project you already know exist.

What usually sits outside the per-yard material price

ItemWhy it matters
Delivery / short loadSmall orders can carry fixed charges or minimums.
Pumping or buggy placementNeeded when the truck cannot discharge close to the forms.
Base preparationExcavation, aggregate and compaction are separate from concrete volume.
ReinforcementRebar, mesh or fibers depend on the project design.
Forms and finishingLabor can be a large part of installed cost.
Washout / cleanupSite logistics should be planned before delivery.

Three checks before ordering

  1. Re-measure the forms after they are set.
  2. Confirm the designed thickness and any thickened sections.
  3. Call the ready-mix supplier for minimum order, increment, delivery and waiting-time rules.

Allowance scenarios

Use the selector to test 5%, 10% and 15% rather than assuming one percentage is always correct. An accurately formed slab over a well-prepared base can have less uncertainty than an irregular excavation with changing depth.

Related guides

See the 12×12 slab example, how much extra concrete to order and what concrete cost per yard actually includes.

Quantity only: this calculator does not determine structural thickness, reinforcement, mix design or code requirements.
Method reviewed September 21, 2026 • Methodology
How to use it

Three checks before you trust the concrete number

  1. Measure the forms. Length, width and approved slab thickness drive the base volume.
  2. Add separate geometry. Thickened edges, footings, steps and ramps should be calculated separately rather than buried in a waste percentage.
  3. Confirm supplier rules. Minimum loads, delivery increments, waiting time and access can change the practical order.
Reviewed September 21, 2026. The calculator uses transparent volume math and documents its limits in the Cost Methodology. Content changes are recorded in the Editorial Update Log.
Page guide

Concrete calculator reference

Formula

Cubic yards = length × width × thickness in feet ÷ 27. Add separate volumes for footings, steps or thickened edges.

Best input

Field dimensions from the forms and the approved slab thickness. Do not combine aggregate-base depth with concrete depth.

Before ordering

Confirm supplier minimums, delivery increments, access, waiting time and the final order allowance.

On this page

Calculator · Cubic yards · Ordering allowance · Ready-mix vs bags

Editorial ownership: maintained by HomeCostEngine Editorial. We separate geometry from supplier pricing and structural design so the result stays auditable.